Project Data
Size (sq ft):
- 1,000,000 sq ft
Integrated Team:
- Architecture: Ellerbe Becket as part of the ASDT
- Structural Engineering: Thornton-Thomasetti
- Construction: Atlanta Stadium Constructors
- Construction Manager: Barton Malow
One of MLB’s most successful franchises has one of the best of the new generation of baseball parks. Ellerbe Becket, as part of the Atlanta Stadium Design Team (ASDT), completed the transformation of the 85,000-seat 1996 Olympic Stadium to a new state-of-the-art ballpark for the Atlanta Braves. The northern end of the stadium was demolished to accommodate a spectacular entry plaza, complete with a Braves Museum and Hall of Fame, an interactive game area, ticket office, Braves Clubhouse Store and a two-level pub. Turner Field seats 48,000 and features 62 suites and three party suites.
Project Data